TWIN CITY A2, A3, A4

TWIN CITY A2, A3, A4
TWIN CITY A2, A3, A4
Location
PRIEVOZSKÁ UL., BRATISLAVA
Project developer
HB Reavis
Karadžičova 12, Bratislava

the scope of implementation by nectel

Complex design and execution of solution
Low voltage installations – execution of the following activities
  • Structured cabling systems
  • Telecommunication network and equipment
  • Optical distribution frames
  • Electrical fire alarm systems (EFA)
  • Voice fire alarm systems signalization (VFA)
  • Electric security system (ESS)
  • Access control system (ACS)
  • Closed-circuit television (CCTV)
  • Door communication system