SHOPPING MALL + OFFICE BUILDING CENTRAL
Location
MILETIČOVA ULICA, BRATISLAVA
Project developer
Immocap Group, a.s.
Plynárenská 7/C, Bratislava
the scope of implementation by nectel
Complex design and execution of solution
High voltage installations – execution of the following activities
- Grounding
Weak current installations – execution of the following activities
- Structured cabling systems
- Telecommunication network and equipment
- Optical distribution frames
- Electrical fire alarm systems (EFA)
- Voice fire alarm systems signalization (VFA)
- Electric security system (ESS)
- Access control system (ACS)
- Closed-circuit television (CCTV)
- Parking and navigation system, turnstiles
- Door communication system